ST Engineering Wins USN Polar Security Cutter Build

ST Engineering Wins USN Polar Security Cutter Build - Hallo sahabat Atlas Military, Pada Artikel yang anda baca kali ini dengan judul ST Engineering Wins USN Polar Security Cutter Build, kami telah mempersiapkan artikel ini dengan baik untuk anda baca dan ambil informasi didalamnya. mudah-mudahan isi postingan Artikel Industri Pertahanan, Artikel Kapal Support, Artikel SINGAPORE, yang kami tulis ini dapat anda pahami. baiklah, selamat membaca.

Judul : ST Engineering Wins USN Polar Security Cutter Build
link : ST Engineering Wins USN Polar Security Cutter Build

Baca juga


ST Engineering Wins USN Polar Security Cutter Build

03 Mei 2019


An artist’s rendering of the USCG Polar Security Cutter. (Image : ST Engineering)

Singapore Technologies Engineering (ST Engineering), announced on 24 April that its shipbuilding business in Pascagoula, MS, VT Halter Marine, has been awarded the Polar Security Cutter (PSC – formerly known as the Heavy Polar Ice Breaker) contract by the US Department of the Navy for the US Coast Guard (USCG).

VT Halter Marine has been designated prime contractor for the detail design and construction of the USCG PSC under a $746 million (€665 million) fixed-price incentive-firm contract. The multi-year programme seeks to acquire up to three multi-mission PSC to recapitalise the USCG fleet of heavy icebreakers. If all options are exercised, the value of the contract could rise to $1.94 billion (€1.73 billion). Delivery of the first 460ft, 33,000t vessel is anticipated for 2024: if the options are exercised, hulls two and three are expected to be delivered in 2025 and 2027 respectively.

VT Halter Marine has been involved in the design analysis study for the PSC since February 2017 and is currently in the production engineering studies support work, which it began in February.

(Monch)


Demikianlah Artikel ST Engineering Wins USN Polar Security Cutter Build

Sekianlah artikel ST Engineering Wins USN Polar Security Cutter Build kali ini, mudah-mudahan bisa memberi manfaat untuk anda semua. baiklah, sampai jumpa di postingan artikel lainnya.

Anda sekarang membaca artikel ST Engineering Wins USN Polar Security Cutter Build dengan alamat link https://atlasmilitary.blogspot.com/2019/05/st-engineering-wins-usn-polar-security.html

0 Response to "ST Engineering Wins USN Polar Security Cutter Build"

Post a Comment